| Environment Moree Plains Shire Council is committed to protecting and preserving our environment.
|
| |
|
|
... Future Direction, Budget. |
|
Read more...
|
|
|
... Future Direction, Pound Facility, Budget. |
|
Read more...
|
|
|
... Current Projects, Budget. |
|
Read more...
|
|
|
... Future Direction, Budget. |
|
Read more...
|
|
|
... Principle Activities, Future Direction, Budget. |
|
Read more...
|
|
|
... Collection Services, Disposal, Recycling, DrumMUSTER, Future Direction, Budget. |
|
Read more...
|
|
|
WMF Stage 5: EIS And Design Of WMF |
WMF Stage 5: EIS And Design Of WMF
MPSC has recently identified a preferred site for the WMF just south
of the Moree Saleyards along the Newell Highway, Moree. MPSC is now
commencing the preparation of an Environmental Impact Statement (EIS)
for the proposed site and designing the WMF.
|
|
Read more...
|
|
|
WMF Stage 4: Detailed Investigations |
Stage 4: Detailed Investigations
Stage 4 involved detailed investigations of most preferred locality
for the new WMF. This locality ‘the study area’ is located
approximately 8km south of Moree on the eastern side of the Newell
Highway and Railway line and incorporates approximately 380 ha.
Detailed investigations were undertaken to obtain information on the
study areas: |
|
Read more...
|
|
|
WMF Stage 3: Preliminary Site Investigations |
Stage 3: Preliminary Site Investigations
Stage 3 involved on-site investigations and the development of
‘property / site profiles’ on each parcel of land identified in Stage 2
and through the Expression of Interest (EOI) process. EOI were invited
from landholders who would voluntarily sell a portion of their land for
the purpose of the WMF.
|
|
Read more...
|
|
|
WMF Stage 2: Preliminary Assessment To Identify Parcels Of Land For Further Investigations |
Stage 2: Preliminary Assessment To Identify Parcels Of Land For Further Investigations
Stage 2 involved a preliminary desktop assessment of a parcel of
land’s appropriateness for the WMF and allowed for a further reduction
in the area of land under consideration in further investigations. This
preliminary assessment used a number of criteria determined by the
Council, Community and DEC to individually assess parcels of land. The
criteria were developed to identify the level of social, economic and
environmental risk that the WMF would have on a parcel of land or
locality. A total of 239 parcels of land were individually assessed.
Following the desktop assessments a further review was undertaken to
verify the results obtained from the desktop assessment. |
|
Read more...
|
|
|
|