Download the MPSC Waste App from the App store or Google Play

Follow Moree Plains Shire on Facebook Follow Moree Plains Shire on Instagram Follow Moree Plains Shire on Twitter Follow Moree Plains Shire on You Tube Moree Plains Shire Council on Linkedin
A- A A+

The construction of the 15 metre high water tower has commenced and soil testing (drilling) has been completed to design the foundations for the water reservoir tower.
1These images show core drilling for soil samples to aid in the structural design for the tower foundations and the pipeline being laid.

IMG 6087 IMG 6086
\