This week, works have continued across both the Active and Passive Pools at the MAAC.
At the Active Pool, extensive piping and electrical conduit installations are underway around the pool perimeter, with preparations being finalised for upcoming concrete works over the piping and conduit. The construction of a shade structure is underway. This structure will assist in managing temperature impacts on the concrete by reducing direct sunlight exposure during the curing process.
Over at the Passive Pool, a new concrete pour has also been completed on the pool steps and seating.